We serve as independent experts to best develop cases concerning loss, working closely with technical experts and lawyers.

 

Recent cases

  • Port concessions: Assessing loss in the context of expropriation in Africa – Arbitration International Center for Settlement of Investment Disputes [ICSID] (World Bank Group).
     

  • Industrial recycling: Cases of loss evaluation resulting from a sorting failure – Arbitration ICC.
     

  • Mining operations: Assessing loss in the context of a mining permit cancellation – Arbitration ICSID (World Bank).
     

  • Railway construction (CAC40): Assessing loss caused by an industrial consortium responsible for electrifying and modernizing a railway line in the Middle East – Arbitration ICC.
     

  • Rail: Assessing loss of a supplier of an important railway line meant to supply an Asian metal mine following the cancellation of a contract – Dispute adjudication board (DAB) of the ICC.
     

  • Industrial infrastructure: Assessing the loss of a supplier of an important equipment supplies factory in India caused by significant delays and variations in scope – Dispute adjudication board (DAB) of the ICC.
     

  • Industrial groups (CAC40): Assisting loss assessment following a damage to a naval field – Arbitration ICC..
     

  • Public buildings and works construction: Assisting loss assessment of an international Greek company due to defects found in the construction of a stadium
    .

  • Public transportation: Assessing loss following the severe malfunction of urban tramways.

 